PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Roof Drains and Overflow roof drains at the lower roof Facing East.jpg Installing the parapet around the perimeter of the top roof at the North Elevation.jpg Laying out block at the detention cells 1st floor Facing North-East.jpg Stair -3 Delivery (2nd floor) Facing North.jpg Waste piping going into the second floor Room 225 Facing North.jpg Welding clips at 4th floor North Elevation.jpg
Previous pageNext page Waste piping going into the second floor Room 225 Facing North
Waste piping going into the second floor Room 225 Facing North